Viridis Power phase 3 embedded power development
In April 2018, Green Frog Utilities Ltd was awarded the contract to design and build gas infrastructure for 100MWe of new build embedded power stations across the North West, South Wales and South of England.
The contract works included the project management of new gas connections, mains, and service infrastructure operating at pressures ranging from 2-7 bar, the supply of new meter installation, and outlet installation pipework to convey gas from the meter to generator installation.
This was a very challenging project covering multiple networks (Cadent, WWU, and SGN) and locations (each having their nuisances and challenges). Green Frog Utilities, acting as principal designer and principal contractor, commenced works in May 2018 and were able to complete all schemes both on time and budget.